
Infiltration tunnels
Faskinetunnel XL End module
The end module is used to start and finish a soakaway tunnel and is produced with pre-marked cutting points for quick and easy drilling of the inlet and outlet in the module. At the top of the end module there is a lifting eye for easy handling of the module by machine lift. It is supplied with a built-in lifting eye and cutting marks for easy fitting of the inlet and outlet, giving fast installation. Supplied on a pallet together with one or more soakaway tunnels.
Specifications
| Product number | 223198210 |
|---|---|
| Volume | 820 L |
| Width | 738 mm |
| Length | 2450 mm |
| Height | 1472 mm |
| Colour | Grey |
| Material | PE |
| Country of manufacture | DK |
Contact us for pricing
alexander@norrloop.noRequest a quote →223198210
Documentation
Documentation
Download the documents for design and installation.